3 sonuçlar
Arama Sonuçları
Listeleniyor 1 - 3 / 3
Yayın Pros and cons of using building information modeling in the AEC industry(ASCE-AMER Soc Civil Engineers, 2019-08-01) Seyis Kazazoğlu, SenemAlthough a plethora of studies on building information modeling (BIM) have been conducted in the last decade, none of the previous studies collate and/or prioritize the benefits, risks, and challenges of BIM based on the data collected from a comprehensive literature review and subject matter experts (SMEs). In order to allow architecture, engineering, and construction (AEC) professionals and academics see the true potential of BIM in a wider context and help them understand its multiorganizational and multidisciplinary functions, there is an obvious necessity for identifying, classifying, and prioritizing the pros and cons of BIM; however, such a study is still currently absent in the AEC literature. The aim of this study is to identify, classify, and rank the pros and cons of BIM that address the benefits, challenges, and risks of BIM in the transition from computer-aided design (CAD). A literature review was performed and face-to-face semistructured interviews with SMEs on BIM were conducted for identification and classification purposes. A total of 41 types of benefits, 11 types of risks, and 13 types of challenges of BIM were identified via triangulation of literature review and face-to-face semistructured interviews with SMEs. The Delphi method was performed for prioritizing the benefits of BIM in terms of time, cost, and sustainability as well as the risks and challenges of BIM encountered in the transition process from CAD to BIM. The interrater agreement and significance-level statistics were performed to analyze and validate the consensus reached by the Delphi panel experts. This paper contributes to the existing body of knowledge on BIM by providing comprehensive identification and classification of the benefits, challenges, and risks of BIM, and prioritization of the benefits for BIM in terms of time, cost, and sustainability as well as the risks and challenges of BIM. The priority rankings of benefits, risks, and challenges of BIM ensure successful completion of projects and create additional value by allowing professionals to make well-informed decisions that support decreasing time and cost-related waste in the transition process from CAD to BIM.Yayın Observatory building design: A case study of DAG with infrastructure and facilities(SPIE, 2016-08-19) Şahmalı, Ali Erkan; Yeşilyaprak, Cahit; Yerli, Sinan Kaan; Keskin, OnurEastern Anatolian Observatory (DAG), will be built in one of the well-known mountain ridges of Erzurum, Turkey, at latitude of 39°46'50, longitude of 41°13'35 and an altitude of 3.151 meters. As well as erecting the largest telescope of Turkey, the DAG project aims to establish an observatory complex both small in size and functional enough to give service to all astronomy community. In this paper, the challenge is explained in details: geological and geographical limitations, environmental and meteorological constraints, engineering and structural considerations, energy efficiency and sustainability.Yayın Coordination in building an observatory: A case study of Eastern Anatolian Observatory (DAG)(SPIE-Int Soc Optical Engineering, 2018) Şahmalı, Ali Erkan; Yeşilyaprak, Cahit; Keskin, OnurEastern Anatolian Observatory (DAG) is designed to build on one of the summits of Palandoken Mountains in Erzurum, Turkey, at an altitude of 3,151 meters. The building is under construction since 2015 and expected to be completed in 2020. The building is designed as an integrated building, having operational departments, services, mechanical and electrical infrastructure for observations as well as cleaning and coating units, adjacent to the main observatory building. As one might expect this integration creates serious coordination problems between architect, engineers, telescope, enclosure, and cleaning & coating unit manufacturers. The construction progress of the investment is almost 20%. There are quite an amount of "lessons learned" in this period, and need to be developed by the parties, for their existing and future works. The building has so many challenges such as geological and geographical limitations, environmental and meteorological constraints, engineering and structural considerations, energy efficiency and sustainability, materials used and their performances at these limitations.












